Gallery |
|
Project |
Customer |
t/year |
Fields of Activity |
Application, Process |
 |
2017
-
2018 |
Bürmoos |
SMK - Salzburger Metall- und Kabelverwertung |
|
Design, tender, implementation supervision and start-up |
Cable recycling & recycling / Sorting plant for old electrical
devices / WEEE: 2 processing lines with impact mills,
separators, rotor shears, dust filter systems and modification
of outdoor units |
| |
2017 |
Bürmoos |
SMK - Salzburger Metall- und Kabelverwertung |
|
Application for authority’s approval for plant extension |
Various adaptation measures: cable recycling & recycling /
sorting plant for old electrical devices / WEEE |
|
2016 |
Halbenrain |
FCC Group |
|
Process Adaptations and Optimisation of MBT Process |
Landfill Mining Pilot Project |
| |
2013 - 2014 |
Rankweil |
AVO |
27.000 |
Application for authority’s approval for plant extension |
Sewage-sludge and green-waste composting; biomass-treatment for fuel production |
| |
2012 - 2014 |
SMK - Salzburger Metall- und Kabelverwertung |
SMK - Salzburger Metall- und Kabelverwertung |
|
Application for authority’s approval |
Various adaptation measures: cable recycling & recycling / sor-ting plant for old electrical devices / WEEE |
| |
2013 - 2014 |
Bergheim |
Alpenrind GmbH |
|
Design, tender, start-up |
Biofilter for exhaust air from slaughterhouse |
| |
2011 |
Asten |
Sonntagbauer GmbH |
|
Application for authority’s approval and co-ordination of fire-protection design and civil engineering |
Process changings and new installations in existing bio-waste composting plant and integration of green-/garden waste treatment line |
| |
2010
-
2011 |
Bürmoos |
SMK - Salzburger Metall- und Kabelverwertung |
20.000 |
Pre-design, tender documents, erection co-ordination, start up |
Process changings and new installations in existing bio-waste composting plant and integration of green-/garden waste treatment line |
| |
2009
-
2010 |
Halbenrain |
.A.S.A. |
80.000 (100.000) |
Preparation of application documents for consolidated plant approval by authorities (combined plant) |
Process changings and new installations in existing bio-waste composting plant and integration of green-/garden waste treatment line |
| |
2009 |
Salzburg |
SAB - Salzburger Abfallbeseitigung |
|
Detail design, tender documents, erection co-ordination, start up |
Process changings and new installations in existing bio-waste composting plant and integration of green-/garden waste treatment line |
| |
2008
-
2009 |
Linz |
Linz AG - Abfallwirtschaft |
20.000 |
Pre-Design; Basic Planning; Cost Calculation |
Process changings and new installations in existing bio-waste composting plant and integration of green-/garden waste treatment line |
 |
2008
-
2009 |
Salzburg |
SAB - Salzburger Abfallbeseitigung |
10.000 |
Detail design, tender documents, complete carrying-out erection, plant start up |
Rebuilding and improvement of intensive composting tunnels for dewatered sludge after anaerobic digestion of bio-waste |
 |
2008 |
St. Pölten |
"Am Ziegelofen" GmbH |
|
Approval of design, detail design, tender documents, erection supervision, plant start up (process design) |
Intermediate storage and truck-loading hall for high caloric material from MBT (RDF - fractions) |
| |
2008 |
Pernitz |
SCA Ortmann |
|
Big-scale material drying tests and basic engineering |
Sewage sludge drying with biological drying reactor |
| |
2007 |
Bürmoos |
SMK Metall –und Kabelverwertung |
|
Project Management |
Installation of feeding bunker system for copper and aluminium cable recycling |

|
2005
-
2006 |
Allerheiligen |
Mürzverband |
24.000 |
Management of whole project |
Installation of a treatment line for MBT – material before landfilling, optimizing exhaust air cleaning; renewing control-system of the biological treatment |
 |
2002
-
2005 |
St. Pölten |
Municipality of
St. Pölten |
45.000 |
Planning for authorities approval of design, detail design, tender documents, complete carrying-out erection, plant start up |
Mechanical biological
waste treatment, bio-waste-composting |
 |
1999
-
2004 |
Halbenrain |
ASA |
70.000 (110.000) |
Planning for authorities approval of design, detail design, tender documents, complete carrying-out erection, plant start up |
Mechanical biological
waste treatment, bio-waste-composting |
 |
2001
-
2002 |
Horse Sports Park Ebreichsdorf |
Allplan
MEC |
10.000 |
Planning for authorities approval of design, detail design and preparation of tender documents |
Composting of horse manure, bio-waste and green-waste |
|
2001 |
Rankweil |
AVO |
|
Plant extension |
Sewage-sludge and green-waste-composting |
|
1999
-
2000 |
Lower Austria |
Langes Feld |
95.000 |
Planning for authorities approval of design
(in co-operation) |
Mechanical biological
waste treatment, bio-waste-composting |
 |
1998
-
2000 |
Rankweil |
AVO |
25.000 |
Complete carrying-out
of project |
Sewage-sludge and green-waste-composting |
|
1998 |
Vienna Globe Resort Park |
Allplan
Magna |
14.000 |
Planning for authorities approval of design |
Co-fermentation of biological waste and sludge; Composting |
|
1997
-
1998 |
St. Pölten |
Municipality of
St. Pölten |
75.000 |
Planning for authorities approval of design |
Mechanical biological
waste treatment |
|
1996
-
1997 |
Tenneck |
PAV |
22.000 |
Planning for authorities approval of design |
Sewage-sludge
composting |
|
1996
-
1997 |
Halbenrain |
ASA |
8.000 |
Reconstruction of ventilation engineering, design and installation of control engineering |
Composting of bio-waste and sewage-sludge |
 |
1994-1997 |
Wels – WAV |
WAV Wels |
22.000 |
Complete carrying-out
of project |
Bio-waste, sewage
sludge, anaerobic
treatment, composting |
 |
1994-1996 |
Allerheiligen |
Mürzverband |
24.000 |
Management of complete Project: Adaption of existing plant on state of the art |
Bio-waste-, residual
waste / sewage sludge- composting |
|
1994 |
Graz-Lannach |
Saubermacher |
18.000 |
Pre-design |
Bio-waste composting |
|
1994 |
Vienna |
ECCE |
|
Planning of a biological filter |
Biological Filter |
|
1993-1994 |
Sulzau |
PAV |
24.000 |
Complete engineering including call for tenders and authorities approval |
Bio-waste-, residual
waste / sewage sludge- composting |
|
1993 |
Attnang |
Kröpfel |
12.000 |
Planning for authorities approval of design |
Composting of bio-waste- and sewage-sludge |
|
1993 |
Kuchl |
Struber |
3.000 |
Planning for authorities approval of design |
Green-waste-composting |
|
1993 |
Pfaffenhofen |
Höpperger |
3.000 |
Pre-design |
Bio-waste composting |
 |
1992 1993 |
Liezen |
AWV Liezen |
3.000 |
Engineering and
construction supervision |
Bio-waste composting |