Gallery |
|
Project |
Customer |
t/year |
Fields of Activity |
Application, Process |
| |
|
Jyväskylä, Finland |
Mustankorkea OY |
20.000 |
Start-Up assistance and technical coordination with main
contractor for plant improvement measures |
Dry digestion system for biowaste
and sewage sludge |
| |
|
Lahti, Finland |
PHJ, Päijät-Hämeen
Jätehuolto OY |
|
Evaluation of the new erected plant and technical
support or necessary upgrading measures |
MSW splitting and refining with material recovery and
RDF production (LATE) |
 |
|
Jyväskylä, Finland |
Mustankorkea OY |
|
Process design, detail design, procurement,
implementation and start-up. |
Installation of 2 pre-treatment plants to mix digestate
and sewage sludge for composting |
| |
|
Lahti, Finland |
Labio OY |
|
Process design, detail design, procurement,
implementation and start-up. |
Different adaptation measures, implementation of liquid
substrate receiving system, machine purchases |
 |
|
Helsinki, Finland |
HSY - Dep. of Waste Management |
20.000 |
Process design, detail design, procurement,
implementation and start-up. |
Adaptation of the old composting plant (VAPO) for
sludge-composting. |
 |
2013
-
2015 |
Helsinki, Finland |
HSY – Dep. of Waste Management |
44.000 |
Process design, detail design, procurement, implementation and start-up. |
Part-stream digestion plant for communal and commercial bio-waste |
| |
2014
-
2015 |
Lahti, Finland |
Labio OY |
|
Design, tender and implementation of a biomass heating plant with a capacity of 0,5 MW |
Heat-support for hygienisation process |
| |
2013 |
Chieming, Germany |
EHG Group |
|
Design, tender documents |
Extension of recycling / sorting plant for old electrical devices |
 |
2012
-
2015 |
Lahti, Finland |
Labio OY |
80.000 |
Process design, detail design, procurement, implementation, start-up, O&M contract |
Dry digestion (part stream) / aerobic and anaerobic treatment of different solid wastes |
| |
2012 |
Zabrze, Poland |
A.S.A. Poland |
50.000 |
Process design, construction basic design, economical calculation |
Biological treatment plant for MSW (tunnel composting) |
 |
2012
-
2013 |
Helsinki, Finland |
HSY – Dep. of Waste Management |
45.000 |
Process design, detail design, procurement, implementation and start-Up |
Upgrading of old VAPO composting plant for bio-waste pre-composting |
| |
2012 |
Lahti, Finland |
Kujalan Komposti OY |
60.000 |
Process design, detail design, procurement, implementation and start-up |
Plant extension: installation of additional sieving and mixing line, 2 wind-sifters and dust filter |
 |
2011
-
2017
|
Helsinki, Finland |
HSY – Dep. of Waste Management (with Pöyry OY Finland |
65.000 (80.000)
|
Process design, detail design, procurement, implementation and start-up |
Upgrading of composting plant and integration of anaerobic digestion plant (part-stream digestion) |
| |
2012 |
Helsinki, Finland |
HSY – Dep. of Waste Management |
30.000 |
Concept study |
Renovation of composting plant including upgrading measures |
| |
2011 |
Helsinki, Finland |
HSY – Dep. of Waste Management |
65.000 |
Pre-Design for receiving and mechanical treatment |
Part-Stream digestion for Bio-waste (domestic and commercial) |
| |
2011
-
2012 |
Lahti, Finland |
Kujalan
Komposti OY
HYGIECOMP |
|
Extension of the tunnel composting plant. – Raising of treatment capacity to 60.000 t/a |
Composting of bio-waste, industrial bio-waste, animal by-products and sewage sludge |
 |
2011 |
Lahti, Finland |
Kujalan
Komposti OY
HYGIECOMP |
|
Extension of exhaust air cleaning system, step II |
Sewage sludge and bio-waste composting: 80.000 => 110.000 m³/h |
| |
2010
-
2011 |
Helsinki, Finland |
HSY – Dep. of Waste Management |
49.000 + 30.000 |
Concept design for upgrading and renovation of 2 composting plants (1 x 49.000 t/a & 1 x 30.000 t/a) |
Bio-waste composting |
 |
2010 |
Lahti, Finland |
Kujalan
Komposti OY
HYGIECOMP |
|
Extension of exhaust air cleaning system, step I |
Sewage sludge and bio-waste composting: 1 MW cooling system |
| |
2010 |
Sofia, Bulgaria |
Alpine Bau Branch Bulgaria |
400.000 |
Pre-design, investment and operational cost calculation for offer |
MBT – plant with separation of RDF and biological stabilization before landfilling |
| |
2008
-
2009 |
Lahti, Finland |
Kujalan
Komposti OY
HYGIECOMP |
60.000 |
Planning for authorities approval for plant extension to rise plant capacities. - New treatment capacity: 60.000 t/a |
Sewage sludge and bio-waste composting |
 |
2007 |
Lethbridge, Canada |
STRABAG Umweltanlagen |
140.000 |
Basic - engineering for exhaust air treatment system |
Anaerobic treatment of slaughterhouse residues, liquid and solid / chemical air pre-treatment and bio-filter |
 |
2007 |
Chieming, BRD |
EHG-Group |
|
Design, tender documents, erection supervision, start up |
Recycling / sorting plant for electrical and electronics old devices |
|
|
2003
-
2006 |
Lahti, Finland |
Kujalan
Komposti OY
HYGIECOMP |
43.700 |
Detail design, tender documents, complete carrying-out erection, plant start up |
Sewage sludge and bio-waste composting |
 |
2002
-
2004 |
Palm Meadows,
Florida, USA |
MEC
Developments
Inc. |
20.000 |
Planning for authorities approval of design, detail design, tender documents, complete carrying-out erection, plant start up |
Horse manure composting plant |
 |
2001
-
2002 |
Turku, Finland |
VAPO OY
Biotech |
33.000 |
Pre-design and process design, consulting for plant start-up |
Sludge composting |
| |
2001 |
Lahti, Finland |
Waste management association region of Lahti |
43.000
40.000 |
Planning for authorities approval of design
Pre-design of mechanical biological waste treatment |
Sewage sludge and bio-waste composting
Residual waste treatment |
| |
2001 |
Kymenlaakson, Finland |
VAPO OY
Biotech |
43.500 |
Pre-design |
Sewage sludge and bio-waste composting |
| |
2000 |
Vava’u; Tonga |
EU |
|
Waste management plan and preparation of tender documents for all equipment and facilities; in co-operation with RRI |
Collection and disposal of household and commercial waste, hospital waste and hazardous waste |
| |
1999
-
2000 |
Slovenia |
City of
Novo Mesto |
40.000 |
Pre-design and planning for authorities approval of design |
Mechanical biological
waste treatment, sorting of commercial waste |
| |
1999 |
Finland |
VAPO OY
Biotech |
40.000 |
Pre-design |
Composting in 3 lines (sludge, residues, bio-waste) |
 |
1997
-
1998 |
Vigonza; Italy |
Consorzio
Tergola |
55.000 |
Engineering and preparation of tender documents |
Co-fermentation of biological waste, sewage-sludge and manure |
 |
1992-1995 |
Beijing, China
BESA |
KfW |
120.000 |
Management of complete project, transfer stations, composting plant, landfills. Project management of composting plant, pre-design and preparation of tender documents |
Mixed waste,
sewage sludge
Disposal and treatment plants |
| |
1992 |
Slovenia |
PTUI |
3.000 |
Evaluation of project |
Bio-waste-composting |
| |
1991 |
Madera, USA
Fresno, USA |
CCSI
Los Angeles |
200.000
200.000 |
Pre-design for environmental impact study |
Mixed waste, sewage sludge, composting |