RAB
RAB
 
Deutsch    English
   
 
 
Design and Construction
of Waste Treatment Plants
International Projects
Gallery

Project

Customer

t/year

Fields of Activity

Application, Process

 

2017
-
2018

Jyväskylä, Finland Mustankorkea OY 20.000
Start-Up assistance and technical coordination with main contractor for plant improvement measures
Dry digestion system for biowaste and sewage sludge
 

2017
-
2018

Lahti, Finland PHJ, Päijät-Hämeen Jätehuolto OY  
Evaluation of the new erected plant and technical support or necessary upgrading measures
MSW splitting and refining with material recovery and RDF production (LATE)
Link HSY VAPO Mechanical

2017

Jyväskylä, Finland Mustankorkea OY  
Process design, detail design, procurement, implementation and start-up.
Installation of 2 pre-treatment plants to mix digestate and sewage sludge for composting
 

2016
-
2017

Lahti, Finland Labio OY  
Process design, detail design, procurement, implementation and start-up.
Different adaptation measures, implementation of liquid substrate receiving system, machine purchases
Link HSY VAPO Mechanical

2015
-
2016

Helsinki, Finland HSY - Dep. of Waste Management 20.000
Process design, detail design, procurement, implementation and start-up.
Adaptation of the old composting plant (VAPO) for sludge-composting.
Link HSY Digestion

2013
-
2015

Helsinki, Finland

HSY – Dep. of Waste Management

44.000

Process design, detail design, procurement, implementation and start-up.

Part-stream digestion plant for communal and commercial bio-waste

 

2014
-
2015

Lahti, Finland

Labio OY

 

Design, tender and implementation of a biomass heating plant with a capacity of 0,5 MW

Heat-support for hygienisation process

 

2013

Chieming, Germany

EHG Group

 

Design, tender documents

Extension of recycling / sorting plant for old electrical devices

Lahti Composting Extension Link Lahti AD Plant

2012
-
2015

Lahti, Finland

Labio OY

80.000

Process design, detail design, procurement, implementation, start-up, O&M contract

Dry digestion (part stream) / aerobic and anaerobic treatment of different solid wastes

 

2012

Zabrze, Poland

A.S.A. Poland

50.000

Process design, construction basic design, economical calculation

Biological treatment plant for MSW (tunnel composting)

Link Vapo General Upgrading

2012
-
2013

Helsinki, Finland

HSY – Dep. of Waste Management

45.000

Process design, detail design, procurement, implementation and start-Up

Upgrading of old VAPO composting plant for bio-waste pre-composting

 

2012

Lahti, Finland

Kujalan Komposti OY

60.000

Process design, detail design, procurement, implementation and start-up

Plant extension: installation of additional sieving and mixing line, 2 wind-sifters and dust filter

Link HSY Biowasher
Link HSY Mechnical Upgrading Horstmann
Link HSY Sieving Sifting Horstmann

2011

-

2017

Helsinki, Finland

HSY – Dep. of Waste Management (with Pöyry OY Finland

65.000
(80.000)

Process design, detail design, procurement, implementation and start-up

Upgrading of composting plant and integration of anaerobic digestion plant (part-stream digestion)

 

2012

Helsinki, Finland

HSY – Dep. of Waste Management

30.000

Concept study

Renovation of composting plant including upgrading measures

 

2011

Helsinki, Finland

HSY – Dep. of Waste Management

65.000

Pre-Design for receiving and mechanical treatment

Part-Stream digestion for Bio-waste (domestic and commercial)

 

2011
-
2012

Lahti, Finland

Kujalan
Komposti OY
HYGIECOMP

 

Extension of the tunnel composting plant. – Raising of treatment capacity to 60.000 t/a

Composting of bio-waste, industrial bio-waste, animal by-products and sewage sludge

Link Lahti Biofilter Extension

2011

Lahti, Finland

Kujalan
Komposti OY
HYGIECOMP

 

Extension of exhaust air cleaning system, step II

Sewage sludge and bio-waste composting: 80.000 => 110.000 m³/h

 

2010
-
2011

Helsinki, Finland

HSY – Dep. of Waste Management

49.000 + 30.000

Concept design for upgrading and renovation of 2 composting plants (1 x 49.000 t/a & 1 x 30.000 t/a)

Bio-waste composting

Link Lahti Cooling

2010

Lahti, Finland

Kujalan
Komposti OY
HYGIECOMP

 

Extension of exhaust air cleaning system, step I

Sewage sludge and bio-waste composting: 1 MW cooling system

 

2010

Sofia, Bulgaria

Alpine Bau Branch Bulgaria

400.000

Pre-design, investment and operational cost calculation for offer

MBT – plant with separation of RDF and biological stabilization before landfilling

 

2008
-
2009

Lahti, Finland

Kujalan
Komposti OY
HYGIECOMP

60.000

Planning for authorities approval for plant extension to rise plant capacities. - New treatment capacity: 60.000 t/a

Sewage sludge and bio-waste composting

2007

Lethbridge, Canada

STRABAG Umweltanlagen

140.000

Basic - engineering for exhaust air treatment system

Anaerobic treatment of slaughterhouse residues, liquid and solid  / chemical air pre-treatment and bio-filter

2007

Chieming, BRD

EHG-Group

Design, tender documents, erection supervision, start up

Recycling / sorting plant for electrical and electronics old devices


2003
-
2006

Lahti, Finland

Kujalan
Komposti OY
HYGIECOMP

43.700

Detail design, tender documents, complete carrying-out erection, plant start up

Sewage sludge and bio-waste composting

 Palm Meadows Entrance

2002
-
2004

Palm Meadows,
Florida, USA

MEC
Developments
Inc.

20.000

Planning for authorities approval of design, detail design, tender documents, complete carrying-out erection, plant start up

Horse manure composting plant

 

2001
-
2002

Turku, Finland

VAPO OY
Biotech

33.000

Pre-design and process design, consulting for plant start-up

Sludge composting

 

2001

Lahti, Finland

Waste management association region of Lahti

43.000

40.000

Planning for authorities approval of design
Pre-design of mechanical biological waste treatment

Sewage sludge and bio-waste composting
Residual waste treatment

 

2001

Kymenlaakson, Finland

VAPO OY
Biotech

43.500

Pre-design

Sewage sludge and bio-waste composting

 

2000

Vava’u; Tonga

EU

Waste management plan and preparation of tender documents for all equipment and facilities; in co-operation with RRI

Collection and disposal of household and commercial waste, hospital waste and hazardous waste

 

1999
-
2000

Slovenia

City of
Novo Mesto

40.000

Pre-design and planning for authorities approval of design

Mechanical biological
waste treatment, sorting of commercial waste

 

1999

Finland

VAPO OY
Biotech

40.000

Pre-design

Composting in 3 lines (sludge, residues, bio-waste)

 Tergola

1997
-
1998

Vigonza; Italy

Consorzio
Tergola

55.000

Engineering and preparation of tender documents

Co-fermentation of biological waste, sewage-sludge  and manure

 Nangong

1992-1995

Beijing, China
BESA

KfW

120.000

Management of complete project, transfer stations, composting plant, landfills. Project management of composting plant, pre-design and preparation of tender documents

Mixed waste,
sewage sludge
Disposal and treatment plants

 

1992

Slovenia

PTUI

3.000

Evaluation of project

Bio-waste-composting

 

1991

Madera, USA
Fresno, USA

CCSI
Los Angeles

200.000
200.000

Pre-design for environmental impact study

Mixed waste, sewage sludge, composting

 

 

 
 
 
 
 
 
 
 
 

 

 
WKO