MBA St. Pölten - Integration of RDF-Storage (Refuse Derived Fuel)


Building Phase
Building Phase
Start if Building Works
RDF-Storage 20-60 and 60 - 160 mm Fracture
Start of Building Works

RDF-Storage RDF 20-60 and 60 - 160 mm Fraction

RDF-Storage bigger than 160 mm Fracture Detail: Sprinkler with Foam-Nozzles
RDF-Storage bigger than 160 mm Fraction Detail: Sprinkler with Foam-Nozzles
Integration into Existing Waste Treatment Facility Installation of Equipment Coordinated with Plant Operation
Integration into Existing Waste Treatment Facility

Installation of Equipment Coordinated with Plant Operation